Core Lab Construction

Lab constructed in existing employee lounge and classroom area, new infrastructure added to support new laboratory requirements Complete layout and coordination of new Beckman Coulter automated analyzer Phased opening of new lab to support relocation of existing lab services

Read More

Congregation Beth Jacob

New social hall facility with meat & dairy kitchens and restroom facilities built on top of existing Education Building Major renovations to existing social hall and education floor including classrooms and administrative area All work performed while in daily use by Congregation

Read More

Greystone at Piedmont Park

Extensive masonry & granite wall stabilization, wood framing, window replacement, site improvements, elevated terrace and interactive amenity pool Coordination of existing structures with new systems, finishes and aquatic support infrastructure Build Georgia Awards 2010 First Place Best Sustainable Building Practices; Atlanta Urban Design Commission – 2010 Award of Excellence for Parks and Landscape Design and…

Read More

FitzCo-Momentum Interior Fit-Up

First generation space for 200+ employees, open & private offices, exterior terrace and coffee bar reception Structural floor slab cut from second floor to install client requested monumental stair and open mezzanine railing Critical completion deadlines achieved for three separate offices moving into the new space as their old leases expired Related to:  Atlanta Stockyards

Read More

Chapel Renovation

Complete renovation of four story Chapel building to provide new elevator, drive through entrance, office space, classrooms, chapel, fellowship hall and kitchen Comprehensive replacement of mechanical, electrical, plumbing and fire protection systems; upgrade to commercial kitchen To continue church operations, temporary HVAC systems were brought online while installing permanent equipment

Read More

Youth & Education Center

Demolition of existing building and construction of new 2-story classroom and education building, including sitework and utilities Construction of new playground Coordinated construction traffic on single, shared driveway – limiting interference with congregant activities and child drop-off & pick-up

Read More

New Worship Facility for Young Israel

Construction of synagogue on several previously residential sites Facility encompasses administrative offices, prep kitchen, integrated IT/Audio/Visual systems, traditional sanctuary, landscaping, new parking lot and electric vehicle charging stations Achieved sustainable goal of attaining EarthCraft – Light Commercial – Gold Certification

Read More

Mechanical Trades Institute

Re-purposed former industrial building into instructional and office space Constructed adjoining building for additional classrooms and welding instructional lab Site development with surface parking for 270 vehicles; loading docks and concrete pads for industrial gas First Place Winner of the AGC’s Build Georgia Award 2019

Read More

Oak Grove United Methodist Church

Demolition of existing buildings made space for new 3-level multi-use building Extensive site utility work involved underground construction in existing parking areas and two public roadways Provided essential classroom space, covered breezeway and enhanced Child Development Center for the growing congregation

Read More

Armour Yards – Core & Shell

Conversion of existing industrial buildings, core build-outs, elevated office structures, rooftop patios, site improvements and parking Constructed new elevated independent structures within existing buildings Developed appropriate landlord infrastructure scope packages with Owner and design team, then integrated into lease negotiations

Read More